+27 73 502 9614 [email protected] Mon-Sat 8:00-17:30
Compliance Requirements For Spectroscopy Solutions

Compliance Requirements For Spectroscopy Solutions

Browse technical resources about solar mounting systems, tracker technology, structural design, and installation best practices.

  • Requirements for laying 20km optical cable

    Requirements for laying 20km optical cable

    163 describes criteria for the installation of optical fibre cables defined in Recommendation ITU-T L. (FOA) was founded in 1995 to help develop the workforce to build the fiber optic networks to support a rapid expansion in communications and the Internet. The charter of the FOA was to promote professionalism in fiber optics through education, certification, and. Recommendations for Fiber Optic Cable Installation Where reels are supplied with protective material fitted over the cable, the protection should remain in place until the cable will be installed. The cable should be bent as little as possible. NOTE: The below considerations are not intended to encompass all installation practices. There are three common laying methods for outdoor optical cables, namely: underground pipeline laying (that is, laying optical cables in underground pipelines), direct underground laying and overhead laying (that is, laying from utility poles to utility poles in the air.

    [PDF Version]
  • Spacing requirements for side-by-side distribution boxes

    Spacing requirements for side-by-side distribution boxes

    Side clearance: There should be a minimum of 30 inches of clearance from the sides of all electrical equipment, but in no case less than the width of the equipment itself. This is referred to as the side-to-side working space. Note that all panel doors and access doors must be able to open a minimum of 90 degrees. Side clearance: There should. When applying Power Distribution Blocks (PDBs), there are various requirements that shall be satisfied, based upon different UL Standards, the NEC®, and the specific application. equipment with or without draw-out parts). To. The National Electrical Code establishes electrical panel clearance requirements to ensure that the panel operates safely and has a clear space in front of it in case of an emergency. If when you open one panel's door, it covers the panel face next to it. Working space around electrical enclosures or equipment must be adequate for conducting all anticipated maintenance and operations safely, including sufficient space to ensure the safety of personnel working during emergency conditions and workers rescuing injured personnel.

    [PDF Version]
  • Fiber optic splice loss requirements unidirectional

    Fiber optic splice loss requirements unidirectional

    A uni-directional test will be conducted on all pigtail splices with no greater than a. 8 dB after 5 repeated attempts results in the replacement and re-splicing of that pigtail. The primary contributors to measured splice loss are fiber material and design factors that. This provides the tester with the ability to accurately measure the connector loss, connector back reflectance and the adjacent splice loss on a short span (15-30 meters from terminating distribution panel). Pigtail tests taken with long patch cords, or any other “adaptation”, will not be accepted. The instrument injects a pulse of. oss is extremely difficult to construct. Losses at a fiber splice depend on various factors like mode power distributions, attenuation, and mod coupling characteristics of the fibers. These characteristics are difficult to measure experimentally and hence several approximate models have evolved in. The standard for splice loss in optical fiber is typically defined by the International Electrotechnical Commission (IEC) or the Telecommunications Industry Association (TIA).

    [PDF Version]
  • Requirements for installing the slide rail distribution box

    Requirements for installing the slide rail distribution box

    Check for proper IP/NEMA ratings and material quality. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. Practice good wiring: secure grounding, neat cable management, proper insulation, and correct wire gauge. In this guide, we'll break down everything you need to know to install a distribution box correctly and confidently. (Adjacent is defined as within a distan equal to the depth of the excavation. The installation is done with low vibration, providing soil support for excavations, adjacent structures and existing. Usage instruction single slide-rail shoring e+s3 Occupational safety and general rema rks according to DIN EN 13331-1/2 1. Lifting, handling, pulling, dragging Handling should be carried out as close to the ground as possible.

    [PDF Version]
  • Requirements for Cable Tray Height and Hanging Height

    Requirements for Cable Tray Height and Hanging Height

    Height Above Ground: Cable trays should ideally be installed at least 2. 3 meters from the ceiling or any other obstructions. This publication is intended as a practical guide for the proper and safe* installation of cable ladder systems, cable tray systems, channel support systems and associated supports. The mechanical and electrical characteristics, tests, certifications, overall quality management, recommendations mentioned in this technical guide only apply to our own cable management ranges and cannot under any circumstances be transposed to si osure, overheating or. The International Electrotechnical Commission (IEC) provides detailed guidelines for cable tray systems under IEC 61537. Establishing partnerships. Is your cable tray system optimized for safety, dependability, space and cost savings? Cable tray (or cable ladder) systems are a popular alternative to electrical conduit systems, as they have an outstanding record for dependable service, design flexibility and cost savings in commercial and.

    [PDF Version]
  • Grounding voltage requirements for distribution boxes

    Grounding voltage requirements for distribution boxes

    Updated to current 2017 NEC, and included design manual requirement to include equipment grounding conductors in all feeder and branch circuits operating under 600 volts, and other editorial and typographic revisions. The voltage, system arrangement, loads connected, and continuity of service drive grounding requirements and design choices. The topic of system grounding is extremely important, as it affects the susceptibility of the system to voltage transients, determines the types of loads the system can. This Grounding Standard describes the technical requirements for grounding the SEC Distribution Network installations. SEC Distribution System extends from the MV (33 kV, 13. To provide. Whether you're a seasoned pro or just starting out, this comprehensive guide will give you practical insights into proper grounding techniques, with a special focus on how selecting quality materials from a reliable building material supplier impacts your entire system's safety and longevity. During fault conditions, low impedance results in high fault current flow, causing overcurrent protective. What is the goal of the NEC requirements for grounding and bonding? Section 250.

    [PDF Version]
  • Temperature and humidity requirements for the hot aisle of the computer room

    Temperature and humidity requirements for the hot aisle of the computer room

    ASHRAE recommends a temperature range of 18°C to 27°C (64°F to 80°F) and humidity levels between 40% and 60%. Proper control of these factors prevents overheating, condensation, corrosion, and static electricity, which can damage equipment. rategies orient the IT racks in what is called a hot aisle/cold aisle layout. Cold aisles are ormed by the space between the front faces of two rows of IT equipment rac. A1 class equipment, which includes most enterprise servers. If you're worried about your PC or data center operating at the right temperature, you're on the right track: The combination of ambient temperature and relative humidity (RH) directly affects reliability hardware performance and lifespan. This range helps prevent overheating, reduces thermal stress on. This document initially develops a list of generalized thermal best-practice recommendations as a first step towards temperature management and measurements in data centers, ultimately saving infrastructure energy as well as protecting the electronic equipment.

    [PDF Version]
  • Standard Requirements for the Appearance of Garden Electrical Distribution Boxes

    Standard Requirements for the Appearance of Garden Electrical Distribution Boxes

    NEC (National Electrical Code) Article 314 provides strict requirements for these installations, and for good reason. This guide breaks down everything homeowners need to know about outdoor electrical junction boxes in plain English. Check for proper IP/NEMA ratings and material quality. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. Practice good wiring: secure grounding, neat cable management, proper insulation, and correct wire gauge and breaker. ng and routing of cables and the earthing and bonding arrangements. The two-way consumer unit in the garage should be fitted with circuit-breakers for the two final circuits such a 6A for the lighting. of Plot & Service junction box with all accessories for trouble free and efficient operation. Applicable Standards: 1200V DC.

    [PDF Version]
  • Fiber Optic Transmission Maintenance Requirements

    Fiber Optic Transmission Maintenance Requirements

    25 deals with general features in relation to the maintenance and operation of optical fibre cable networks. This revision is intended to be appropriate for the current situation with respect to. Fiber optic network optimization has become a key task to ensure efficient operations with the ever-growing demand for data transmission and the increasing need for high-speed, low-latency connectivity. It could hurt an installer or get them sued by an irate network owner. Fiber optic testing and maintenance protocols not only maintain the reliability of the network, but also allow for early detection of potential failures and optimization of performance. This fiber optic infrastructure, built upon these key factors, not only meets current business demands but also scales to. Different network requirements demand different fiber specifications: Single-mode fibers (OS2) for long-haul and high-speed networks. Multimode fibers (OM3, OM4, OM5) for data centers and enterprise backbone connectivity. Armored or outdoor-rated cables for FTTA applications or environments with.

    [PDF Version]
  • Optical Module Coating Requirements

    Optical Module Coating Requirements

    Coating: Select the coating method by requirements and volume—automated spray, dip, or selective coating—and tightly control thickness. 7 of the Laser Optics Resource Guide. Inspection & rework:. The development of optical functional films and the related coating processes are core competencies at the Fraunhofer Institute for Surface Engineering and Thin Films IST. In many industrial applications, e. photovoltaics, optoelectronics, displays, precision and consumer optics, laser. al been bodies). normally Internation technical electrotechnical coll b rates standardization. closely. In a common POM class Quad Small Form-factor Pluggable (QSFP), for example, power dissipation requirements have increased from a typical 4-5W in a QSFP-28 (100 GbE) to 15-20W for the latest-generation 400 GbE QSFP- Double Density (QSFP-DD) modules, and more than 20W for 400ZR Data Center. Minimum requirements for antireflecting coatings Part 6 Optics and photonics.

    [PDF Version]

Need Product Pricing?

Contact us for competitive quotes on any of our fiber optic products

Get a Quote